The power system is an essential part of modern life in any country. It provides [...]
On December 14th, 2022, National Load Dispatch Centre (EVNNLDC) organized a workshop on [...]
Hợp đồng EPC một hình thức quản lý mới trong đầu tư xây dựng công [...]
Usually, before the investment and construction of a power plant project in Vietnam (even the [...]
Owner Ha Noi Thien Y Environmental Energy Joint Stock Company Voltage lever 110kV Capacity 75MW [...]
The grid impact study is an essential requirement for power plants, substations, and demands when [...]
Relay Setting Calculation is an essential task for a Power plant before operation. The parameter [...]
Owner Hong Phong 2 Wind power JSC Voltage level 110kV Capacity 20MW Location Binh Thuan [...]
Reactive Power Capability Calculation is a very important part in design and construction of wind [...]
Owner Hong Phong 1 Wind power JSC Voltage level 110kV Capacity 40MW Location Binh Thuan [...]
With the best understanding and experiences on power market as well as principles on its [...]
Power Purchase Agreement (PPA) Under Circular No.57/2020/TT-BCT issued by MOIT regulations on the method for [...]