Monsoon Wind Farm in Laos

Owner Impact Energy Asia Development Limited Company (IEAD)
Voltage level 500kV
Capacity 600MW
Location Sekong Province, Lao PDR
Project Monsoon Wind Farm, Laos
Client
Power China (Lao) Sole Co., LTD
Tasks of Vietnam PRP Corp.
  1. Grid Connection Study.
  2. Preparing detailed procedures for the Grid Connection Agreement Signed with NLDC (A0)/NPT.
  3. Calculation and Adjustment of Protection Relay Settings.